Load Management System Test

The cooperative's load management system will undergo a test on September 13 from 1 p.m. to 2 p.m. During this test, members who have a radio-controlled switch on their water heater and/or air conditioning system will notice that the switch is activated. While activated, the light on the switch(es) will turn red (instead of green). Members do not need to respond or reduce load in any way during the test.